Please be informed that the National Grid Corporation of the Philippines (NGCP) is scheduling a power service interruption on October 23, 2024 (Wednesday).
Date: October 23, 2024
Time: 6:30AM-7:00AM & 5:30PM-6:00PM
Affected areas: Whole town of Botolan
Momentary outage for shifting and isolation of loads.
Replacement of insulators at the isolated segment.
• Taugtog S/S connected to Botolan S/S
• San Felipe S/S connected to Olongapo S/S
Momentary outage for shifting and isolation of loads (Normalization).
• San Antonio S/S connected to Botolan S/S
• San Marcelino S/S connected to Olongapo S/S
In case you or your customers will operate standby generator set/solar during shutdown, please make sure to trip-off/open your respective breaker/isolator going to our line to ensure safety of our maintenance personnel.
Please consider our lines always energized as we shall restore electric service without prior notice. Thank you.